LEMON Manuals: Even more car manuals for everyone
Home >> Buick >> 2004 >> Regal GS >> Repair and Diagnosis >> Accessories & Equipment >> Gauges & Instrument Panels >> Instrument Panel System Displays, Gauges And Console >> Repair Instructions >> Knee Bolster Replacement >> Installation Procedure

Installation Procedure

    Fig 1: Knee Bolster To Steering Column Bolts
    GM629737Courtesy of GENERAL MOTORS CORP.
  1. Install the knee bolster to the instrument panel (I/P).
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the bolts which secure the knee bolster to the steering column support.

    Tighten:  Tighten the bolts to 10 N.m (89 lb in).

  4. Fig 2: Knee Bolster To I/P Bolts
    GM629733Courtesy of GENERAL MOTORS CORP.
  5. Install the bolts which secure the knee bolster to the I/P.

    Tighten:  Tighten the bolts to 2 N.m (18 lb in).

  6. Install the steering column opening filler. Refer to Steering Column Filler Replacement .
  7. Install the left I/P insulator. Refer to Closeout/Insulator Panel Replacement - Left .