Installing The A-Pillar With Reinforcement
NOTE:
TECHNICAL INFORMATION
For the repair, only use approved spot welders.
For additional information see: 41 00... Workshop equipment
For the repair, only use approved spot welders.
For additional information see: 41 00... Workshop equipment
NOTE:
TECHNICAL INFORMATION
For additional information see: 41 00...
Installation of a cavity sealing (not expanding)
For additional information see: 41 00...
Installation of a cavity sealing (not expanding)
- Apply sealant D1 to cavity sealing (1)
.
CONSUMABLE SPECIFICATION
Sealant D1 (seam sealing) 310 ml 83425A547B4 - Install cavity sealing (1)
in the new part.
- Adjust the new part using an alignment bracket or a universal fixture and secure it.
- Weld new part in areas (1)
and (2)
as per new part preparation processes.
In the areas (2) , observe the procedure for replacing spot-welded adhesive joints of the standard production.
NOTE: To provide a better overview: Schematic diagram with partially hidden components. - Weld the new part in the area (1)
according to the new part preparation process.NOTE: To provide a better overview: Schematic diagram with partially hidden components.
- Weld the new part in the area (1)
according to the new part preparation process.NOTE: To provide a better overview: Schematic diagram with partially hidden components.
- Install the new part crash reinforcement and weld it in areas (1)
as per the new part preparation processes.
For better clarity, the bulkhead (2) is not shown.
- Install the reinforcement plate (3)
and weld.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00...
Installation of a cavity sealing (not expanding) - Apply sealant D1 to the new cavity sealings (1)
.
CONSUMABLE SPECIFICATION
Sealant D1 (seam sealing) 310 ml 83425A547B4 - Fit cavity sealings (1)
.
- Apply sealant D1 to the cavity sealings (1) .
- Install the new part outer shell of the A-pillar and the reinforcement plates.
- Weld the new part and the reinforcement plates in areas (2)
to (4)
according to the new part preparation process.
In the areas (2) and (3) , observe the procedure for replacing spot-welded adhesive joints from standard production.
- Weld the new part and reinforcement plate in areas (1)
and (2)
as per new part preparation process.
In the area (2) , observe the procedure for the replacement of spot-welded adhesive joints for the standard production.