54 13 Soft Topping Operation, Fully Automatic Technical Data
WARNING: This page is about a different car, the 2025 BMW M4, 2024 BMW M4, 2023 BMW M4, 2022 BMW M4, and 2021 BMW M4. However, it is still accessible from the selected car via links, so may be relevant.
54 13 TECHNICAL DATA OVERVIEW
| Adhesive bead of the side window | ||
| Width a | 8 +3-1 mm | |
| Height b | 12 +1-2 mm | |
| Processing time | max. 7 min | |
| C-nozzle | ||
| For windshields, rear windows, and body-specific side window glass | Diameter A | 7.5 +1-1 min |
| Height B | 13 +1-1 mm | |
| HS-AM multi-base filler VOC | ||
| Layer thickness | 30 μm... 40 μm | |
| Hardening time with infrared | 10 min | |
| Hardening time without infrared 60°C |
30 min | |
| Hardening time without infrared 20°C |
1 Tag | |
| Residual height of the adhesive bead | ||
| Residual height of the adhesive bead | max. 1 mm | |
| Sika primer 206 | ||
| Protrusion of the glass activator track opposite the crimped adhesive bead | 1 mm... 2 mm | |
| Air drying time at over 15°C | 10 min | |
| Air drying time at under 15°C | 30 min | |