Supplying The New Parts Required
NOTE:
TECHNICAL INFORMATION
For additional information see: 41 00... Repair method for repair stage 2
- Observe the procedure for repair stage 2.
For additional information see: 41 00... Repair method for repair stage 2
- For information about stripping and rebuilding operations, refer to the surrounding text in the AIR. See the FRU number.
Preliminary work
Follow-up work
- Prepare the following new parts
:
Roof outer skin (1)
NOTE:
TECHNICAL INFORMATION
- Supply the following consumables:
Material Quantity Adhesive K5 (195 ml) 1 Punch rivet N5 15 Cleaning agent R1 1 Cleaning agent R2 1 Twist drill high strength 4.2 x 66 mm 1 EMC screw 2 Sealing compound D1 1 Sealing compound D2 1
NOTE:
TECHNICAL INFORMATION
Store adhesive at room temperature.
Adhere to adhesive processing temperature of 15 - 28°C without fail.
Before installation: Store roof outer skin and vehicle for at least 12 hours at room temperature (17°C to 35°C).
Store adhesive at room temperature.
Adhere to adhesive processing temperature of 15 - 28°C without fail.
Before installation: Store roof outer skin and vehicle for at least 12 hours at room temperature (17°C to 35°C).
- Additionally required: Special tool 2 469 797 (see ASAP, service/technology - workshop equipment - Start BMW or www.bmwgroup-wep.com)