Installing the LIN power distribution box
WARNING:
Work on components with requirements for a secure energy supply
Ensure proper function after a repair
Ensure proper function after a repair
- Lines are allowed to have only one repair area.
- Notices in the diagnostic system circuit diagrams must be observed.
- When components are replaced, the notices in the applicable BMW parts catalogue must be observed.
- Position the LIN power distribution box (1) correctly and shift the locking device (2) in arrow direction.
- Connect connectors (1) and lock.
- Position the power distribution (2) correctly and engage it into the holder (3).
Detents (1) must engage correctly.
Follow-up work