Remove wiring harness section for the ignition system of cylinder bank 2
WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2023 BMW M5, 2022 BMW M5, 2021 BMW M5, 2020 BMW M5, and 2019 BMW M5. However, it is still accessible from the selected car via links, so may be relevant.
WARNING:
Hot fluids
.
Risk of scalding!
Risk of scalding!
- Conduct all work in the vehicle wearing appropriate personal protective equipment only.
NOTE:
TECHNICAL INFORMATION
Collect and dispose of emerging fluids. Observe country-specific waste disposal regulations.
Collect and dispose of emerging fluids. Observe country-specific waste disposal regulations.
Preliminary work
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to REMOVING THE ACOUSTIC COVER .
- Refer to REMOVING THE COVER PANEL OF THE SLAVE DME CONTROL DEVICE .
- Refer to REMOVING HOLDER OF DME CONTROL UNIT FOR CYLINDERS 5 TO 8 .
- Refer to REMOVING COOLANT EXPANSION TANK .
- Refer to DISCONNECTING PLUG CONNECTIONS OF THE INJECTORS OF CYLINDER BANK 2 .
- Refer to DISCONNECTING PLUG CONNECTIONS OF THE IGNITION COIL OF CYLINDER BANK 2 .
- Loosen nut (3) .
- Loosen screw (2) .
- Release the wiring harness section in the marked areas (1)
.
- Loosen nut (3) .
- Loosen screw (2) .
- Disconnect the wiring harness section from the holders (4) .
- Release wiring harness section with holder (1) .
- Remove the wiring harness section.