Installing Side Frame Completely
NOTE:
TECHNICAL INFORMATION
For the repair, only use approved spot welders.
For additional information see: 41 00... Workshop equipment
For the repair, only use approved spot welders.
For additional information see: 41 00... Workshop equipment
- Pre-clean adhesive area (1)
on vehicle and on new part with solvent cleaner R2.
CONSUMABLE SPECIFICATION
Cleaning agent R2 500 ml 83190417324 - Clean adhesive area (1)
on vehicle and on new part with solvent cleaner R1.
CONSUMABLE SPECIFICATION
Cleaning agent R1 100 ml, Bottle 83192211217 - Apply adhesive K1 to adhesive area (1)
.
ADHESIVE SPECIFICATION
Body adhesive K1 195 ml 83190413015 NOTE: TECHNICAL INFORMATION
For additional information see: 41 00...
Installation of a cavity sealing (not expanding) - Apply sealant D1 to cavity sealing (2)
.
CONSUMABLE SPECIFICATION
Sealant D1 (seam sealing) 310 ml 83425A547B4 - Install cavity sealing (2) .
- Apply sealant D1 to cavity sealing (3) .
- Apply sealant D1 to cavity sealing (1)
.
CONSUMABLE SPECIFICATION
Sealant D1 (seam sealing) 310 ml 83425A547B4 - Install cavity sealing (1) .
- Apply sealant D1 to cavity sealing (2)
.
- Install the new part using an alignment bracket or a universal fixture and secure it.
- Weld areas (1)
and (2)
as per the new part preparation process.
- N.B.: Component located on the new part (1) is shown masked out for illustrative purposes.
- Weld new part in areas (2) to (4) as per the new part preparation process.
- Weld all three panels in area (3) .
- Avoid applying too much heat to adjacent adhesive area (5)
.
- Weld new part in areas (1)
and (2)
as per the new part preparation process.
In so doing, avoid excessive heat input at the adhesive areas (3) behind.
- Apply repair spot-welds to series spot-welds in areas (2)
.
- Weld new part in the areas (1)
.
- Weld new part in areas (1) and (2) as per the new part preparation process.
- Avoid applying too much heat to adjacent adhesive area (5)
.
- Weld new part in areas (1)
and (2)
as per the new part preparation process.
- Weld new part in areas (1) and (2) as per the new part preparation process.
- Perform plug weldings (2)
in area (3)
from the inside.
- Weld new part in areas (1)
and (2)
as per the new part preparation process.
In so doing, avoid excessive heat input in the adhesive area (3) behind.
- Apply repair spot-welds to series spot-welds in areas (2)
.
- Apply sealant D1 to cavity sealing (2) . Install cavity sealing (2) .
- Pre-clean adhesive area (1)
on vehicle and on new part with solvent cleaner R2.
CONSUMABLE SPECIFICATION
Cleaning agent R2 500 ml 83190417324 - Clean adhesive area (1)
on vehicle and on new part with solvent cleaner R1.
CONSUMABLE SPECIFICATION
Cleaning agent R1 100 ml, Bottle 83192211217 - Apply adhesive K1 to adhesive area (1)
.
ADHESIVE SPECIFICATION
Body adhesive K1 195 ml 83190413015 - Apply sealant D1 to cavity sealing (2) .
- Install new part and weld in areas (1)
and (2)
as per the new part preparation process.
- Apply sealant D1 to new cavity sealing (1)
. Install cavity sealing (1)
.
- Cut off area (1) of radiator tank.
- Leave open area (2) of radiator tank.
- Adapt radiator tank further if necessary.
- Install radiator tank with sealant D1.