Supplying The New Parts Required
NOTE:
TECHNICAL INFORMATION
For additional information see: 41 00... Repair method for repair stage 3
- Observe the procedure for repair stage 3.
For additional information see: 41 00... Repair method for repair stage 3
- For information about stripping and rebuilding operations, refer to the surrounding text in the AIR. See the FRU number.
Preliminary work
Follow-up work
- Prepare the following new parts ):
Carrier support, wheel arch, front (1)
Carrier support brace (2)
Extension of the wheel well carrier support (3)
Carrier support for lower wheel well (4)
A-pillar bulkhead (5)
Wheel arch carrier support shaped part, front
NOTE:
TECHNICAL INFORMATION
- Supply the following consumables:
| Material | Quantity |
|---|---|
| Adhesive K5 (50 ml) | 2 |
| Blind rivet N1 | 40 |
| Blind rivet N2 | 5 |
| Punch rivet N4 | 20 |
| EMC screw | 31 |
| Cleaning agent R1 | 1 |
| Cleaning agent R2 | 1 |
| Sealing compound D2 | 1 |
| Cavity protection wax remover | 1 |