Install front intake pipe
- Replace O-rings.
Parts: O-rings
- Feed in and correctly position the intake pipe (2).
- Tighten down screw (1).
TIGHTENING TORQUE SPECIFICATIONS
| Refrigerant line to connecting piece | ||
|---|---|---|
| M8 | Tightening torque | 19 Nm |
- Place the intake pipe (3) on the air conditioning compressor.
- Tighten down screw (2).
TIGHTENING TORQUE SPECIFICATIONS
| Refrigerant line on air conditioning compressor | ||
|---|---|---|
| M8 | tightening torque | 19 Nm |
- Correctly position the coolant hose (1).
- Insert the coolant hose (1) into the holder (2) if applicable.
- Connect connectors (3) and lock.
- Connect the connector (1) to the alternator (2) and lock.
Follow-up work
- Refer to INSTALLING THE BRACKET FOR THE DME CONTROL UNIT .
- Refer to INSTALLING THE ENGINE CONTROL UNIT COVER .
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .
- Refer to EVACUATE AND CHARGE CONDITIONING .
- Replace O-rings.
Parts: O-rings
- Feed in and position intake pipe (3) correctly.
- Tighten the screws (2).
TIGHTENING TORQUE SPECIFICATIONS
| Refrigerant line on air conditioning compressor | ||
|---|---|---|
| M8 | tightening torque | 19 Nm |
TIGHTENING TORQUE SPECIFICATIONS
| Refrigerant line to connecting piece | ||
|---|---|---|
| M8 | Tightening torque | 19 Nm |
- Position the coolant hose (1) carefully and correctly as needed.
Follow-up work
- Refer to INSTALLING THE BRACKET FOR THE DME CONTROL UNIT .
- Refer to INSTALLING THE ENGINE CONTROL UNIT COVER .
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .
- Refer to EVACUATE AND CHARGE CONDITIONING .