Preparing New Parts
NOTE:
TECHNICAL INFORMATION
For additional information see: 41 00... Spot-weld bonding steel components
For additional information see: 41 00... Spot-weld bonding steel components
- Remove adhesive residue on the vehicle joining areas.
- Release welded connections in areas (1)
.
- Release the welded connections in areas (1)
and remove the bulkhead (2)
.
- Release the welded connections (1)
and remove the crash reinforcement (2)
.
- Detach the welded connections (1)
.
- Release welded connections in areas (1)
.
- Make a separating cut on the outer side sill area in accordance with separating cut on the vehicle.
- Adjust the new part using an alignment bracket or a universal fixture and secure it.
- Prepare areas (1)
and (2)
for joining by welding.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00...
Spot-weld bonding steel components - Follow the procedure for replacing standard production spot-welded adhesive joints in the areas (2) .
- Prepare the areas (3)
so the repair spot-welds can be set on the production spot-welds.
Mind the bonded connections (4) located on the other side.
- Prepare areas (1)
for joining by welding.
- Prepare areas (1)
for joining by welding.
- Adjust the new part crash reinforcement (2)
and prepare for joining by welding in the areas (1)
.
- Adjust the bulkhead (1) and prepare for joining by welding in the areas (2) and (3) .
- Follow the procedure for replacing standard production spot-welded adhesive joints in the areas (3)
.
- Prepare areas (1) for joining by welding.
- Prepare the areas (2)
so the repair spot-welds can be set on the production spot-welds.
Mind the bonded connections (3) located on the other side.
- Adjust the connecting plate (1) and prepare for joining by welding in the areas (2) and (3) .
- Follow the procedure for replacing standard production spot-welded adhesive joints in the areas (3)
.
- Fit in new part.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00...
Spot-weld bonding steel components - Prepare areas (1)
and (2)
for joining by welding.
Follow the procedure for replacing standard production spot-welded adhesive joints in the areas (2) .
NOTE: TECHNICAL INFORMATION
Structural adhesive bonding .
Observe preparation of bonding surfaces.
For additional information see: 41 00...
BMW bonding instructions - Prepare the area (3) for the structural adhesive bonding of steel on steel.