Installing engine ventilation line of cylinder bank 1
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Insert the engine ventilation line (2) and turn it counter-clockwise.
- Tighten down screws (1).
TIGHTENING TORQUE SPECIFICATIONS
| Engine ventilation line | ||
|---|---|---|
| screw | Tightening torque | 9.3 Nm |
- Position engine ventilation line (2).
- Connect and lock retaining clip (1).
Follow-up work
- Refer to INSTALLING THE TANK VENTILATION LINE OF CYLINDER BANK 1 PARTIALLY .
- Refer to ATTACHING THE WIRING HARNESS SECTION FOR THE IGNITION SYSTEM OF CYLINDER BANK 1 .
- Installing cable duct at cylinder bank 1.
- Position the conduit (2).
- Tighten the screws (1).
TIGHTENING TORQUESCable duct M6x16 screw Tightening torque 10Nm - Refer to INSTALLING THE EXPANSION TANK FOR THE CHARGE AIR COOLER .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE COVER PANEL OF THE MASTER DME CONTROL UNIT .