Installing the trim panel on the through-loading system
- Guide in and correctly position coolant pump.
- Mount the expanding rivets (1).
- Mount the expanding rivets (1).
Follow-up work
- Refer to INSTALLING LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL .
- Refer to INSTALLING THE TOP LUGGAGE COMPARTMENT TRIM PANEL .
- Refer to INSTALLING LOADING EDGE TRIM .
- Refer to INSTALLING LUGGAGE COMPARTMENT FLOOR COVERING .