51 48... Notes for bonding sound insulation (SI), doors (330i xDrive Wagon, 328d xDrive Wagon, 330i GT xDrive, 340i GT xDrive)
WARNING: This page does not describe the selected car, but rather 11 other vehicles, including the 2019 BMW 340i GT xDrive, 2019 BMW 330i xDrive, 2019 BMW 330i GT xDrive, 2018 BMW 340i GT xDrive, and 2018 BMW 330i xDrive. However, it is still accessible from the selected car via links, so may be relevant.
Required special tools:
- 51 0 300
IMPORTANT:
Do not yank at the sound insulation (risk of damage).
General:
Sound insulation is bonded to the inner door panel.
Bonded sound insulation must not be loaded (e.g. leak test) before 5 hours have elapsed.
On-the-job safety:
When working with bonding products (adhesive, cleaning agent, etc.):
- Wear safety goggles, hand protection and, if necessary, an apron.
- Ensure the area is well ventilated.
- Change work clothes contaminated with adhesive immediately.
- Change work clothes contaminated with solvents and swelling agents immediately (keep spare work clothes on hand).
- Take skin protection measures, provide washing facilities including hot water, use silicone-free skin creams.
- Always keep an eyewash on hand, change the water regularly (once a month).
- Comply with the relevant safety regulations.
Handling adhesive area on inner door panel:
| Adhesive | Cleaning |
|---|---|
| a. Butyl bead applied to sound insulation with protective film | a. CLEANING AGENT R2
. Under no circumstances: paint thinning |
| b. Butyl mini-round profile 0 4 mm from the roller | b. Carry out bonding only after an air drying time ≥ 1 min. Air drying time may be omitted if the entire bonding surface is wiped with a dry cloth |
| c. Butyl round profile 0 6 mm from the roller | c. After cleaning, the bonding surface may not be touched with hands or contaminated again |
Repair in area of sound insulation, door:
| Repair |
|
| in the event of damaged sound insulation or leakage |
|
The sound insulation must be bonded watertight below the door lock:
- Flat bonding surface required all round.
- No bonding in the event of moisture (e.g. condensation, etc.).
- Bonding area must not show any traces of adhesion-reducing residues (e.g. separating agents, greases, oils, paraffins, plastisols, cavity wax, polishing dust residues, etc.).
- Remove the protective film directly before joining (under no circumstances remove earlier, since the butyl, because of its stickiness, will very quickly pick up adhesion-reducing dirt contaminants).
- The sound insulation must be attached with positional accuracy to the inner door panel because it will no longer be possible to change the position without damaging the butyl bead.
- With repainted areas, the maximum permitted temperature of 90°C may not be exceeded in the area of the sound insulation. Otherwise, the sound insulation must be removed (and replaced, if necessary).
Expiry date of adhesive:
24 months, see label on packaging.
Disposal of the cleaning cloth:
Cleaning cloths and cleaning agent residues are hazardous waste (see also safety data sheet).
Disposal of adhesive:
Hazardous waste (see also safety data sheet).