Installing coolant pumps
- Loosen screw (1).
- Feed out coolant line (2) and remove.
- Feed in and install the coolant pump (1).
- Tighten down screws (1).TIGHTENING TORQUES SPECIFICATION
Coolant pump to component carrier M6x20 tightening torque 10.5 Nm - Tighten down screws (1).TIGHTENING TORQUES SPECIFICATION
Coolant pump to component carrier M6x20 tightening torque 10.5 Nm - Coat the sealing ring (1) on the coolant line (2) with fresh coolant.
- Insert the coolant line (2) and install it.
- Tighten down screw (1).TIGHTENING TORQUES SPECIFICATION
Coolant line of coolant radiator to coolant pump M6x20 tightening torque 10.5 Nm - Connect and lock coolant line (1).
The coolant line (1) must engage audibly.
- Feed the cleaning cloth (1) out of the crankcase (2) and set it aside.
Follow-up work
- Refer to INSTALLING THE COOLANT LINE BETWEEN THE CYLINDER HEAD AND THE COOLANT PUMP .
- Refer to REPLACING FRONT CRANKSHAFT SEAL .
- Refer to INSTALLING THE VIBRATION DAMPER .
- Refer to INSTALLING STARTER MOTOR .
- Refer to INSTALLING THE ACOUSTIC COVER FOR THE OIL SUMP .
- Refer to INSTALLING THE DRIVE BELT FOR THE STARTER MOTOR GENERATOR .
- Refer to INSTALLING CHARGE AIR LINE .
- Refer to INSTALLING THE CLEAN AIR PIPE AND THE RESONATOR .
- Refer to INSTALLING THE INTAKE FILTER HOUSING (TENSION STRUT REMOVED ON SHOCK TOWER) .
- Refer to INSTALLING FAN COWL .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING TENSION STRUT ON LEFT AND RIGHT SHOCK TOWER .
- Refer to INSTALLING UPPER CROSS CONNECTION .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT AT TOP LEFT AND RIGHT .
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .
- Refer to FILLING AND VENTING THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE FRONT BOTTOM RIGHT WHEEL ARCH COVER .
- Refer to INSTALLING THE STIFFENING PLATE .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .