Installing the wiring harness section of the blow-off valve for cylinders 5-8
- Feed in and position the wiring harness section of the blow-off valve.
- Connect connectors (1) and lock.
- Fix wiring harness section in area (2).
- Connect connectors (1) and lock.
Follow-up work
- Refer to INSTALLING THE RIGHT UNFILTERED-AIR DUCT .
- Refer to INSTALLING COVER FOR THE RIGHT DME CONTROL UNIT .
- Refer to INSTALLING THE TENSION STRUT ON THE RIGHT SHOCK TOWER .
- Refer to INSTALLING RIGHT CLEAN AIR PIPE .
- Refer to PARTIALLY INSTALLING THE RIGHT ENGINE VENTILATION LINE .
- Refer to CONNECTING THE RIGHT CHARGE AIR LINE TO THE EXHAUST TURBOCHARGER .
- Refer to INSTALLING LEFT CLEAN AIR PIPE .
- Refer to INSTALLING THE LEFT ENGINE VENTILATION LINE (PARTIALLY REMOVED) .
- Refer to CONNECTING THE LEFT CHARGE AIR LINE TO THE EXHAUST TURBOCHARGER .
- Refer to INSTALLING THE CARRIER PLATE .
- Refer to INSTALLING BOTH INTAKE FILTER HOUSING .
- Refer to INSTALLING ACOUSTIC COVER .