Install heat management module
NOTE:
RISK OF DAMAGE
Improper routing of cables and wiring harnesses .
Trapped, crushed or damaged cables may cause short circuits and malfunctions .
Improper routing of cables and wiring harnesses .
Trapped, crushed or damaged cables may cause short circuits and malfunctions .
- Route all cables without abrasions, do not trap and crush.
NOTE:
TECHNICAL INFORMATION
The sealing surfaces must be free of oil, grease and cleaning agents.
The sealing surfaces must be free of oil, grease and cleaning agents.
NOTE:
RISK OF DAMAGE
Damage to the surface .
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage .
Damage to the surface .
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage .
- Do not use any metal-cutting tools.
- Clean sealing surfaces (1).
- Replace sealing rings (1) on connecting pipe (2).
Parts: Sealing ring
- Coat sealing rings (1) with coolant before installing.
- Replace sealing rings (1) on heat management module (2).
Parts: Sealing ring
- Coat the sealing rings (1) on the heat management module (2) with coolant before installing.
- Guide in and install the connecting pipe (1) in the arrow direction on the heat management module (2).
- Insert and install the heat management module (1) with the connecting pipe (2).
- Make sure that the connecting pipe (2) is installed correctly.
- Tighten down screws (1).TIGHTENING TORQUES SPECIFICATION
Heat exchange module to crankcase M6 Tightening torque 9 Nm - Connect connector (1) to the knock sensor and lock it.
The connector (1) must engage audibly onto the knock sensor.
- Secure clamps (2).
- Connect and lock the coolant line (4).
The coolant line (4) must engage audibly.
- Secure the clamp (3).
- Connect connectors (1) and (2) to the heat management module and lock them.
The connectors (1) and (2) at the heat management module must engage audibly.
- Feed in and install the grounding cable (2).
- Tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Grounding cable on the starter motor generator M8 tightening torque 19 Nm - Secure the clamp (3).
- Connect and lock coolant lines (1) and (2).
The coolant lines (1) and (2) must engage audibly.
- Connect and lock coolant line (1).
The coolant line (1) must engage audibly.
- Feed in the support (2) for the intake plenum and install it.
- Tighten down screws (1).TIGHTENING TORQUES SPECIFICATION
Support to cylinder head M6X16 tightening torque 8 Nm - Secure clamps (1).
- Secure clamps (2).
Follow-up work
- Refer to INSTALLING THE INTAKE PLENUM .
- Refer to INSTALLING THE TANK VENT VALVE .
- Refer to INSTALLING THE LOW-TEMPERATURE COOLANT EXPANSION TANK .
- Refer to INSTALLING INTAKE FILTER HOUSING .
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .
- Refer to FILLING AND VENTING THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to FILLING AND VENTING THE LOW-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING THE COVER OF THE STEERING ASSEMBLY .
- Refer to INSTALLING THE FRONT BOTTOM RIGHT WHEEL ARCH COVER .
- Refer to INSTALLING THE STIFFENING PLATE .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .
- Refer to INSTALLING ACOUSTIC COVER AT REAR .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to TAKING HOOD OUT OF THE SERVICE POSITION .