Fill the cooling system with the vacuum filling unit
Vacuum filling equipment
Vacuum filling equipment - connected to the coolant expansion tank
- Vacuum filling equipment with pressure gauge and shutoff valves
- Filling hose
- Fluid tank with coolant
- Venturi nozzle
- Compressed air connection (7 bar)
- Exhaust hose (route exhaust hose into a collecting vessel)
Precondition
Sufficient premixed coolant must be present in the fluid tank of the vacuum filling equipment, 1 I to 2 I more than the filling capacity prescribed for the vehicle. The fluid tank of the vacuum filling equipment must be positioned at the same height as the coolant expansion tank.
The vacuum filling equipment must be functional and free of dirt.
Immobilization period-long fill of coolant!
Do not reuse used coolant.
The coolant must be replaced when replacing and removing components which depend on the anti-corrosion effect of the coolant. The cooling system must therefore be emptied and refilled.
In the case of other removal work involving the draining of part quantities of coolant, the coolant level must be topped up with new coolant.
Notes for working on the engine cooling system.
For additional information see: NOTES FOR WORKING ON THE COOLING SYSTEM .
It must be ensured that the ignition (terminal 15) is switched off before filling with the vacuum filling equipment.
Not the type of coolant
Coolant in the collecting vessel of vacuum filling equipment
Choose the correct coolant for filling.
In general, a vehicle must be filled with the coolant with which it was delivered from the plant.
- G48 (Blue) (BMW LC-87)
Must not be mixed with i3 Coolant or G30 MINI Diesel W16 or HT12 (Pink), HT12 (Green).
- i3 Coolant (Blue) (BMW LC-13)
Is exclusively used for i3 heater circuit. i3 Coolant must not be added to other coolant circuits or be mixed with other coolants.
- HT12 (Pink) (BMW LC-18)
Must not be mixed with i3 Coolant or G30 MINI Diesel W16 or G48 (Blue).
- HT12 (Green) (BMW LC-18)
Must not be mixed with i3 Coolant or G30 MINI Diesel W16 or G48 (Blue).
- G30 (Pink) (BMW LC-07)
May only be used for MINI Diesel W16. G30 must not be added to other coolant circuits or mixed with other coolants.
Damage to the engine or components in high-voltage vehicles
If the wrong coolant is used, corrosion or gelling can occur in the coolant circuit.
- Only use coolants that have been approved for the specific vehicle.
- Only fill the vehicle with the coolant with which it was delivered ex works.
- Only mix compatible coolants. The color does not indicate the compatibility of coolants.
- Selection of the correct coolant exclusively via part number.
When using vacuum filling equipment to fill the coolant circuit, you must use special tool 5 A31 EF2 (strainer) to protect the inside of the coolant circuit from contaminants.
- Connect special tool (2) 5 A31 EF2 to the vacuum filling equipment (1).
- Connect the special tool (2) with the appropriate adapter (3) from the set of special tools 0 494 417 (17 0100)
- Fill the cooling system with special tool 2 152 473.
- Select a suitable adapter (Y) from the set of special tools 0494 417 (17 0100):
Type Engine Adapter (Y) from 17 0 100 G05/G06/G07 B47/B57/B48/B58 170 105 TECHNICAL DATA SPECIFICATIONSFilling capacity of high-temperature coolant circuit G05/G06/G07/G18 B58B30M1 12.6 l B58B30M1 (OE823) 13.6 l - Connect the selected adapter (Y) to the coolant expansion tank.
- Connect the vacuum filling equipment to the connection (X) of the adapter.
- Check whether shutoff valves (A) and (B) of vacuum filling equipment (1) are closed.
- Connect and lock connection (X) to the coolant expansion tank.
- Connect Venturi nozzle (1) to the vacuum filling equipment (2).
(X) is the connection on the coolant expansion tank.
- Connect compressed air (1).
(X) is the connection on the coolant expansion tank.
- Open shutoff valve (B).
The venturi nozzle generates a flow noise.
- Open shutoff valve (A) until the filling hose (1) is full without bubbles.
- Close the shutoff valve (A) again.
» The filling hose (1) has now been bled.
- Check the coolant hoses for porosity and, if necessary, replace them.NOTE: TECHNICAL INFORMATION
During vacuum build-up, the coolant hoses will contract. - After a vacuum of -0.8 to -0.95 bar is reached in the coolant circuit (approx. 2 min), close shutoff valve (B).
- Check whether shutoff valves (A) and (B) are closed.
- Disconnect the Venturi nozzle (1).
Check
- The vacuum in the coolant circuit must be maintained for at least 2 min.
Result
» Vacuum drops.
Measure
- Search for leaks, repair them, and start the filling procedure from the beginning.
Check
- The vacuum in the coolant circuit must be maintained for at least 2 min.
Result
» Vacuum remains constant.
Measure
- Continue with filling.
- Keep shutoff valve (B) closed during the filling process.
- To fill the cooling system, open shutoff valve (A) to the fluid tank of the vacuum filling equipment.
- Stop the filling procedure when the needle in the pressure tester is on 0 bar or it no longer drops.
- If necessary, reduce remaining vacuum. Open the shutoff valve (B).
- Remove the vacuum filling equipment with the adapter from the coolant expansion tank.
- Adjust the coolant level to the maximum mark.
- After filling the engine cooling system with the vacuum filling equipment, also carry out the cooling system bleeding procedure.