Installing the pressure line between the air conditioning compressor and the air conditioning condenser
- Replace O-rings.
Parts: O-rings
- Feed in and correctly position the pressure line (2) between the air conditioning compressor and the air conditioning condenser.
- Tighten down screw (1).TIGHTENING TORQUE SPECIFICATIONS
Refrigerant lines to air conditioning condenser/connecting piece M6 Tightening torque 13 Nm - Fit the pressure line (2) on the air conditioning compressor (3).
- Tighten the screw (1) of the refrigerant line (2).TIGHTENING TORQUE SPECIFICATIONS
Refrigerant line on air conditioning compressor M8 tightening torque 19 Nm - Replace O-ring.
Parts: O-ring
- Place the intake pipe (2) on the air conditioning compressor (3).
- Tighten the screw (1) from the side of the wheel well on the intake pipe (2).
TIGHTENING TORQUE SPECIFICATIONS
| Refrigerant line on air conditioning compressor | ||
| M8 | tightening torque | 19 Nm |
Follow-up work
- Refer to INSTALLING THE LEFT UNFILTERED-AIR DUCT .
- Refer to INSTALLING INTAKE FILTER HOUSING .
- Refer to INSTALLING THE RIGHT STRUT BRACE .
- Refer to INSTALLING THE STRUT BRACE .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING TENSION STRUT ON LEFT AND RIGHT SHOCK TOWER .
- Refer to INSTALLING UPPER CROSS CONNECTION .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT AT TOP LEFT , and INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE TOP RIGHT .
- Refer to INSTALLING THE HOLDER FOR THE DME CONTROL UNIT ON THE LEFT .
- Refer to INSTALLING THE DME CONTROL UNIT OF CYLINDERS 5 TO 8 .
- Refer to INSTALLING COVER FOR THE LEFT DME CONTROL UNIT .
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to EVACUATE AND CHARGE CONDITIONING .