Preparing New Part
Further information is available.
NOTE:
TECHNICAL INFORMATION
Structural adhesive bonding .
Observe preparation of bonding surfaces.
For additional information see 4100... BMW/MINI BONDING INSTRUCTIONS (ALL X5 MODELS, 2019-2022) .
Structural adhesive bonding .
Observe preparation of bonding surfaces.
For additional information see 4100... BMW/MINI BONDING INSTRUCTIONS (ALL X5 MODELS, 2019-2022) .
- Remove adhesive residue from the flange surfaces.
- Adjust new parts with an alignment bracket or a universal fixture and secure.
- Prepare area (1) for structural adhesive bonding with blind rivets of aluminum on aluminum.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Transferring hole pattern. - Transfer the hole pattern to the new part in area (1).
Drill out holes to dia. 6.8 mm.
- Prepare areas (1) and (2) for structural adhesive bonding with blind rivets of aluminum on aluminum.
- Transfer the positions of the holes from the engine mount to the spring support in areas (1). Drill out holes to dia. 6.8 mm.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Transferring hole pattern. - Transfer the hole pattern from the engine mount to the spring support in areas (2). Drill out holes to dia. 6.8 mm.
- Prepare area (1) for structural adhesive bonding with blind rivets of aluminum on steel.
- Transfer the hole positions from the wheelhouse to the spring support in area (1). Drill out holes to dia. 6.8 mm.
- Prepare area (1) for structural adhesive bonding of steel on aluminum with blind rivets.
- Transfer the hole positions from the engine compartment bulkhead to the spring support in area (1). Drill out holes to dia. 6.8 mm.
- Prepare area (1) for structural adhesive bonding with blind rivets of aluminum on aluminum.
- Prepare area (2) for structural adhesive bonding of steel on aluminum with blind rivets.
- Set holes Ø 6.8 mm in the areas (1) and (2). Get the number and position of the holes from the standard parts.
- Prepare the area (1) for the structural adhesive bonding of steel on steel.
- Prepare areas (1) and (2) for structural adhesive bonding with punch rivets of aluminum on aluminum and of steel on aluminum.
- Mark the separating cut (1) on the new part in accordance with the separating cut (2) on the vehicle with a material allowance of 15 20 mm and carry out the cut.
- In areas (3), prepare overlapping joining by welding.
- Fit in new part section.
- Prepare area (1) for structure bonding steel on steel.
- Prepare area (2) for joining by welding.
- Set a hole Ø 6.8 mm centrally in area (1). Area (1) can be seen from the bottom.
- Set two bores (2) Ø 6.8 mm according to dimension (a). Dimension (a) = 70 mm from the component edge.
- Transfer holes (3) to the new part and drill with Ø 6.8 mm.
- Adapt the new part in the area of the existing holes (4).
- Remove new parts and deburr bores.