Install rail of cylinder bank 1
- Position high pressure rail.
- Fit bolts (1) to system by hand.
- Fit bolts (1) to system by hand.
- Tighten nut (2) on the high pressure pump with the special tool 0 491 277 (13 5 020).
TIGHTENING TORQUE SPECIFICATIONS
| Fuel supply line/rail to high pressure pump | ||
|---|---|---|
| Nut | tightening torque | 30 Nm |
- Tighten nuts (1) on the injectors with the special tool 0 495 908 (37 1 150) .
TIGHTENING TORQUE SPECIFICATIONS
| High-pressure rail to injectors | ||
|---|---|---|
| Nuts | Tightening torque | 23 Nm |
- Tighten down screws (1).
TIGHTENING TORQUE SPECIFICATIONS
| Rail to cylinder head cover | ||
|---|---|---|
| M6x25 screw | Tightening torque | 10 Nm |
- Tighten down screws (1).
TIGHTENING TORQUE SPECIFICATIONS
| Hold-down device to cylinder head cover | ||
|---|---|---|
| screw | Tightening torque | 13 Nm |
Follow-up work
- Refer to INSTALLING IGNITION COILS OF CYLINDER BANK 1 .
- Refer to INSTALLING BRACKET FOR RIGHT INTAKE SILENCER .
- Refer to INSTALLING RIGHT INTAKE SILENCER HOUSING .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to RECONNECTING ALL BATTERY GROUND LEADS .