Installing the high-pressure line between the high-pressure pump and the high-pressure rail
- Guide in the high pressure line (4) in the mount (3) and install.
- Tighten the union nuts (arrows) with the special tool 0 495 280 (13 0 140)
.TIGHTENING TORQUES SPECIFICATION
High pressure line between the rail and the high pressure pump M14x1.5 Tightening torque 33 Nm - Feed in and install wiring harness section of the engine wiring harness (4).
The locks (3) must engage audibly.
- Connect connectors (1) and (2) and lock.
The connectors (1) and (2) must audibly engage.
Follow-up work
- Install all IGNITION COILS
- Mount the top engine sound insulation SERVICE OPENING
- Install ACOUSTIC COVER
- Reconnect all battery GROUND LEADS
- Activate the 48 v ELECTRICAL SYSTEM