Installing the high-pressure line between the high-pressure pump and the high-pressure rail
- Guide the special tool 2 413 106
out and remove.
- Thread in and install the high pressure line (2).
- Tighten union nut (1) hand tight.
- Tighten union nut (1).TIGHTENING TORQUES SPECIFICATION
High pressure line between high pressure pump and rail M14 Tightening torque 33 Nm
Follow-up work
- Install all IGNITION COILS .
- When working on the last cylinder: mount the top engine sound SERVICE OPENING .
- Install the cylinder head cover ACOUSTIC COVER .
- Reconnect all battery GROUND LEADS
- Activate the 48 v ELECTRICAL SYSTEM .
- Install ACOUSTIC COVER .