Install cross connection
- Installed on the right side only on vehicles with production date as oft 12/2016
- Secure spray guard (1)
to cross connection (2)
as shown.
- Install cross connection.
- Position all screws.
- Tighten down screw (1)
.TIGHTENING TORQUE SPECIFICATIONS
Bracing strut to top cross connection M8 Tightening torque 25 Nm - Tighten the screws (2)
.TIGHTENING TORQUE SPECIFICATIONS
Air duct to deformation element/cross connection M6x20 screw Tightening torque 6 Nm NOTE: RISK OF DAMAGE
Incorrect routing of the Bowden cable for the hood lock .
Chafing of the coolant ventilation line, coolant loss and engine overheating .- Route the Bowden cable of the hood lock correctly under the lock bridge.
- Hook Bowden cable in all clips.
- Make sure that the Bowden cable has no contact with the coolant ventilatin line.
- Fasten clamps (3) for hood lock Bowden cable to cross connection.
- Tighten screws (2)
of cross connection (3)
.TIGHTENING TORQUE SPECIFICATIONS
Cross connection on support for cross connection M6x20 Tightening torque 12 Nm - Fasten expanding rivet (1) .
- Tighten the screws (2)
.TIGHTENING TORQUE SPECIFICATIONS
Cross connection on support for cross connection M6x20 Tightening torque 12 Nm - Fasten expanding rivet (1) .
- Installed on the right side only on vehicles with production date as oft 12/2016
- Mount spray guard (1) correctly to prevent corrosion.
- Secure spray guard (1)
to the lock bridge with retaining tabs (2)
.