Installing the left and right charge air cooler (engine removed)
- First guide down charge air cooler (2) and position it.
- Replace hose with clamps (2)
.
Parts: Hose, clamps
- Tighten hose clamp (1)
.TIGHTENING TORQUES SPECIFICATION
hose hose Tightening torque 3.5 Nm - Connect hose (2) .
- Retaining clip (1)
must engage audibly.
- Engage the holder (2) on the charge air cooler.
- Tighten down screw (1)
.TIGHTENING TORQUES SPECIFICATION
Charge air cooler top M6x30 screw Tightening torque 10 Nm - Connect the line (1)
and lock.
- Position holder (3) .
- Tighten down screw (2)
.TIGHTENING TORQUES SPECIFICATION
Charge air cooler bottom M6x18 screw Tightening torque 10 Nm - Replace the hose.
Parts: Hose
- Tighten the hose clamp (1)
.TIGHTENING TORQUES SPECIFICATION
hose hose Tightening torque 3.5 Nm - Slide the hose (2) onto the stud of the charge air cooler.
- Replace hose clamp with hose.
Parts: Hose clamps and hose
- Tighten the hose clamp (1) .
- Thread in the hose (3)
in the holder on the charge air cooler.
- Attach the coolant lines (2) .
- Retaining clip (1)
must engage audibly.
- Position the cable in the cable bracket (2) and lock.
- Connect and lock the plug connections (1)
.
- First, insert the charge air cooler (1)
on the bottom and position. hose
- Replace the hose and clamps (1)
.
Parts: Hose, clamps
- Tighten the hose clamps (1)
on the charge air cooler (2)
.TIGHTENING TORQUES SPECIFICATION
hose hose Tightening torque 3.5 Nm - Position the connecting plate of the charge air cooler (2) .
- Tighten down screws (1)
.TIGHTENING TORQUES SPECIFICATION
Connecting plate of charge air cooler screw Tightening torque 6.5 Nm - Connect plug connection (2) and lock.
- Tighten down screw (1)
.TIGHTENING TORQUES SPECIFICATION
Charge air cooler top M6x30 screw Tightening torque 10 Nm - Snap line (1)
into holder (2)
.
- Position the centering pin on holder (1)
downwards in lug (2)
on the charge air cooler.
- Engage the holder (1)
on the charge air cooler.
- Position the line.NOTE: There is risk of breakage.
- Connect plug connection (2) and lock.
- Connect the line (1)
and lock.
- Connect hose (2) .
- Retaining clip (1)
must engage audibly.
- Connect the line (1)
and lock.
- Position holder (3) .
- Tighten down screw (2)
.TIGHTENING TORQUES SPECIFICATION
Charge air cooler bottom M6x18 screw Tightening torque 10 Nm - Replace the hose.
Parts: Hose
- Tighten the hose clamp (1)
.TIGHTENING TORQUES SPECIFICATION
hose hose Tightening torque 3.5 Nm - Slide the hose (2) onto the stud of the charge air cooler.
- Replace hose clamp with hose.
Parts: Hose clamps and hose
- Tighten the hose clamp (3) .
- Thread in the hose (1)
in the holder on the charge air cooler (4)
.
- Slide the hose (2) onto the stud of the charge air cooler.
- Replace hose clamp with hose.
Parts: Hose clamps and hose
- Tighten the hose clamp (3) .
- Thread in the hose (1)
in the holder on the charge air cooler (4)
.
- Attach the coolant lines (2) .
- Retaining clip (1) must engage audibly.
Installing oil filler neck
- Replace the sealing ring (2)
on the oil filler neck (1)
.
Parts: Sealing ring
- Coat the sealing ring (2)
with the recommended engine oil.ENGINE OIL SPECIFICATION
Technically suitable engine oils for BMW Group engines - Position oil filler neck (1) .
- Turn oil filler neck (1)
about 15° counterclockwise.
- Tighten screw (2)
on the oil filler neck (3)
.TIGHTENING TORQUES SPECIFICATION
Oil filler neck M6x30 tightening torque 10 Nm - Tighten screw (1) on the oil filler neck (3) .
TIGHTENING TORQUES SPECIFICATION
| Oil filler neck | ||
| M6x30 | tightening torque | 10 Nm |