Install battery ground lead
- Position the negative battery cable (2).
- Tighten nut (1).
tightening torque specification
| Battery ground lead to body | ||
|---|---|---|
| Flange Nut M8 | Tightening torque | 15 nm |
- Connect connectors (3) and lock.
Follow-up work
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48V ELECTRICAL SYSTEM .