Installing the component carrier
NOTE:
RISK OF DAMAGE
Damage to the surface .
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage .
Damage to the surface .
The use of metal-cutting tools (e.g., emery cloths) for cleaning surfaces can damage them and lead to leaks and/or engine damage .
- Do not use any metal-cutting tools.
NOTE:
TECHNICAL INFORMATION
The sealing surfaces must be free of oil, grease and cleaning agents.
The sealing surfaces must be free of oil, grease and cleaning agents.
- Check the centering sleeves (1)
for damage, replace centering sleeves (1)
if necessary.
- Clean sealing surfaces (1) with special tool 0 495 102 (11 4 470) .
Check
- Inspect sealing bead (1) on the component carrier (2) for damage.
- Check protrusion of sealing bead (1)
at the component carrier (2)
.
Result
» Sealing bead (1) does not protrude from component carrier (2) or sealing bead (1) is damaged.
Measure
- Replace the sealing bead (1) .
NOTE: TECHNICAL INFORMATION
The processing time of the liquid sealing compound can be at a maximum of 10 min.
Commissioning of the assembly is not possible until 25 minutes after the processing time.
Non-observance can lead to leaks in the assembly. - Apply the sealing compound with a height of approximately 2 mm to 2.5 mm.
- Have the special tool 2 469 803
ready.
- Position the sealing compound (1)
as shown on the special tool 2 469 803
.
Parts: Sealing compound
SEALING COMPOUND SPECIFICATIONSLoctite 5970 liquid sealing compound Processing time < 10 minutes at room temperature 50 ml, Cartridge 83190404517 - Feed in component carrier (2) and install.
- Hand-tighten the bolts (1)
.
- Hand-tighten the bolts (1)
.
- Tighten down screws (1)
.TIGHTENING TORQUE SPECIFICATION
Component carrier to crankcase M8x35 tightening torque 19 Nm - Tighten down screws (1)
.TIGHTENING TORQUE SPECIFICATION
Component carrier to crankcase M8x35 tightening torque 19 Nm - Insert and position the wiring harness section (2) for sensor system 2 .
- Secure the clamp (1)
.NOTE: TECHNICAL INFORMATION
Make sure that the connections are locked correctly. The locks must engage audibly. - Connect and lock the coolant line (3) .
- Connect and lock the coolant line (4) .
- Connect and lock the coolant line (5) .
- Feed in and install the electric changeover valve (2) in the direction of the arrow .
- Lock (1) must engage audibly.
Follow-up work
- Refer to INSTALLING THE ELECTRIC A/C COMPRESSOR (EKK) .
- Refer to INSTALLING THE ELECTRIC COOLANT PUMP FOR THE CHARGE AIR COOLER AND THE AIR CONDITIONING CONDENSER .
- Refer to INSTALLING THE INTAKE PLENUM .
- Refer to INSTALLING THE TANK VENT VALVE .
- Refer to INSTALLING CONTROL UNIT BRACKET .
- Refer to INSTALLING THE INTEGRATED POWER SUPPLY MODULE (PDM) .
- Refer to INSTALLING THE DME CONTROL UNIT .
- Refer to INSTALLING COOLANT LINE BETWEEN THE COOLANT PUMP AND CYLINDER HEAD .
- Refer to CONNECTING THE COOLANT LINES FOR THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING THE TENSIONING PULLEY FOR THE COOLANT PUMP .
- Refer to INSTALLING THE DRIVE BELT FOR THE COOLANT PUMP .
- Refer to INSTALLING THE ACOUSTIC COVER FOR THE ENGINE AT THE FRONT .
- Refer to INSTALLING CHARGE AIR LINE .
- Refer to INSTALLING THE CLEAN AIR PIPE WITH THE RESONATOR .
- Refer to INSTALLING ACOUSTIC COVER AT REAR .
- Refer to INSTALLING THE FRONT HOOD SEAL AT THE REAR .
- Refer to FILLING THE HIGH-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLING EQUIPMENT .
- Refer to FILLING THE LOW-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLING EQUIPMENT .
- Refer to EVACUATE AND CHARGE CONDITIONING .
- Refer to CONNECTING NEGATIVE BATTERY CABLE OF THE SYSTEM BATTERY .
- Refer to VENTING THE HIGH-TEMPERATURE COOLANT SYSTEM .
- Refer to VENTING THE LOW-TEMPERATURE COOLING SYSTEM .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE STIFFENING PLATE .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .
- Refer to TAKING HOOD OUT OF THE SERVICE POSITION .