Installing the blow-off valve of cylinder bank 1
- Check the seal (1) for damage. If necessary, replace the blow-off valve (2).
Parts: Blow-off valve
- Position the blow-off valve of the bank 1.
- Position all screws manually.
- Tighten screw.
TIGHTENING TORQUE SPECIFICATIONS
| Blow-off valve to turbocharger | ||
|---|---|---|
| M6 | tightening torque | 9±1 Nm |
- Tighten the screw with the special tool 0 496 646 (11 4 410).
TIGHTENING TORQUE SPECIFICATIONS
| Blow-off valve to turbocharger | ||
|---|---|---|
| M6 | tightening torque | 9±1 Nm |
- Tighten screw.
TIGHTENING TORQUE SPECIFICATIONS
| Blow-off valve to turbocharger | ||
|---|---|---|
| M6 | tightening torque | 9±1 Nm |
- Connect connectors (1) and lock.
Follow-up work
- Refer to INSTALLING CLEAN AIR PIPE OF CYLINDER BANK 1 .
- Refer to CONNECTING THE RIGHT CHARGE AIR LINE TO THE TURBOCHARGER .
- Refer to INSTALLING THE COVER OF THE RIGHT DME CONTROL UNIT .
- Refer to INSTALLING ACOUSTIC COVER .