Installing the positive battery cable power distribution at the rear
- Feed in power distribution of positive battery cable (2).
- Tighten nut (1).TIGHTENING TORQUES SPECIFICATION
Power distribution box Plastic nut with flange tightening torque 2.6 Nm - Tighten the positive battery cable (3) using the nut (2).TIGHTENING TORQUES SPECIFICATION
Positive battery cable Positive pole screw tightening torque 15 Nm - Close the cover (1).
Follow-up work
- Refer to INSTALLING THE LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL ON THE RIGHT .
- Refer to INSTALLING THE TOP LUGGAGE COMPARTMENT TRIM PANEL .
- Refer to INSTALLING TRUNK COMPARTMENT LIGHT .
- Refer to INSTALLING LOADING EDGE TRIM .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .