Installing the high-pressure line between the high-pressure pump and the high-pressure rail
WARNING: This page does not describe the selected car, but rather 7 other vehicles, including the 2025 BMW X4, 2024 BMW X4, 2023 BMW X4, 2022 BMW X4, and 2021 BMW X4. However, it is still accessible from the selected car via links, so may be relevant.
- Guide in the high pressure line (4) in the mount (3) and install.
- Tighten the union nuts (arrows) with the special tool 0 495 280 (13 0 140). TIGHTENING TORQUE SPECIFICATIONS
High pressure line between the rail and the high pressure pump M14x1.5 tightening torque 33 Nm - Feed in and install wiring harness section of the engine wiring harness (4).
The locks (3) must engage audibly.
- Connect connectors (1) and (2) and lock.
The connectors (1) and (2) must audibly engage.
Follow-up work
- Refer to INSTALLING ALL IGNITION COILS .
- Refer to MOUNTING THE SERVICE OPENING IN THE SOUND INSULATION ON TOP OF THE ENGINE .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to ACTIVATING ELECTRICAL SYSTEM .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .