Installing the instrument cluster (KOMBI)
- Connect the plug connector (1) to the instrument cluster (KOMBI) (2).
- Guide in the instrument cluster (KOMBI) (2) and snap into the detents.
- Tighten down screws (1).TIGHTENING TORQUES SPECIFICATION
Instrument cluster (KOMBI) to support Screw tightening torque 1.8 Nm
Follow-up work
- Refer to INSTALLING STEERING COLUMN SHROUD LOWER SECTION .
- Refer to FITTING STEERING COLUMN SHROUD UPPER SECTION .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48 V ELECTRICAL SYSTEM .