Remove A-Pillar Reinforcement
- Release welded connections in areas (1).
- Open brazed connection in area (2).NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Releasing bonded connections - Open spot-welded adhesive joints in areas (3).
- Release bonded connection in area (4).
- Release outer section of A-pillar from cavity sealing (5) and remove.
- Release welded connections in areas (1).
- Open spot-welded adhesive joints in areas (2).
- Remove connecting plate (3).
- Remove cavity sealing (4).
- Carry out the rough separating cuts (1) on the bulkhead (4).
- Partially open the welded connections in areas (2) with a file belt grinder.
- Open spot-welded adhesive joints in areas (3).
- Remove bulkhead (4).
- Open welded connections in areas (1) and remove crash reinforcement (2).
- Mark separating cut (1) according to dimension a and cut.
In so doing, do not damage the bulkhead (2) underneath.
Dimension a = 110 m.
- Release welded connections in areas (1).
- Open spot-welded adhesive joints in areas (2).
- Release lower A-pillar from cavity sealing (3) and remove.
- Perform separating cuts (1) as shown.
- Open welded connections in area (2) and remove sheet metal cutout (3).
- Remove cavity sealing (3).
- Loosen welded connections in areas (1).
- Open spot-welded adhesive joints in area (2) and remove A-pillar reinforcement.