Installing the 12 V dual storage system
WARNING:
Incorrect screw connection of the positive battery cable.
Risk of fire!
Risk of fire!
- Ensure that the positive battery cable is screwed with the correct nut.
- Install the 12 V dual storage system (3).
- Position the positive battery cable (2) on the positive battery terminal.
- Tighten nut (1).
TIGHTENING TORQUE SPECIFICATIONS
| Positive battery terminal to battery | ||
| Nut | tightening torque | 5 Nm |
Check
- Check the guide (1) and the snap-in lugs (2) on the positive terminal cover (3) for damage.
Result
» The guide (1) or snap-in lugs (2) are damaged.
Measure
- Replace the positive terminal cover (3).
- Connect connectors (5) and lock.
- Install the battery rollover protection bracket (4).
- Tighten nut (3).
TIGHTENING TORQUE SPECIFICATIONS
| Retainer 12-V dual storage system | ||
| Nut M8 | Tightening torque | 15 Nm |
- Position the positive terminal cover (2).
- Clip in the detents (1) of the positive terminal cover (2).
Follow-up work
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to INSTALLING WINDSHIELD PANEL COVER .
- Refer to INSTALLING LEFT AND RIGHT WIPER ARM .
- Refer to INSTALLING THE REAR RIGHT ENGINE COMPARTMENT COVER .
- Refer to INSTALLING THE COVER OF THE ENGINE COMPARTMENT ON THE REAR LEFT .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to DEACTIVATING THE 48 V ELECTRICAL SYSTEM .