Installing the positive battery cable power distribution at the rear
Preliminary work
- Refer to DISCONNECTING ALL BATTERY GROUND LEADS .
- Refer to REMOVING THE LOADING EDGE TRIM .
- Refer to REMOVING RIGHT LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL .
- Feed in power distribution of positive battery cable (3).
- Tighten down screw (2).
TIGHTENING TORQUE SPECIFICATIONS
| Power distribution box, positive battery terminal | ||
| Screw TS6x20 | Tightening torque | 1.2 Nm |
- Connect all connectors (1).
- Tighten the positive battery cable (3) using the nut (2).
TIGHTENING TORQUE SPECIFICATIONS
| Positive battery cable | ||
| Positive pole screw | tightening torque | 15 Nm |
- Close the cover (1).
Follow-up work
- Refer to INSTALLING THE LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL ON THE RIGHT .
- Refer to INSTALLING LOADING EDGE TRIM .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .