Installing the low power distribution box
- Connect connector (3).
- Push the lock (2) downward.
- Clip in cable with holder (1).
- Insert the power distribution box (2).
- Tighten plastic nuts (1).
TIGHTENING TORQUE SPECIFICATIONS
| Power distribution box | ||
| Plastic nut with flange | tightening torque | 2.6 Nm |
- Tighten all nuts (1).
TIGHTENING TORQUE SPECIFICATIONS
| Positive battery cable | ||
| Positive pole screw | tightening torque | 15 Nm |
- Clip in the cover (1).
- Tighten the positive battery cable using the nut (1).
TIGHTENING TORQUE SPECIFICATIONS
| Positive battery cable | ||
| Positive pole screw | tightening torque | 15 Nm |
- Tighten the positive battery cables using the screws (2).
TIGHTENING TORQUE SPECIFICATIONS
| Positive battery cable | ||
| M8x16 screw | tightening torque | 15 Nm |
- Connect all connectors (3).
- Clip in the cover (1).
Follow-up work
- Refer to INSTALLING THE LUGGAGE COMPARTMENT WHEEL ARCH TRIM PANEL ON THE RIGHT .
- Refer to INSTALLING LOADING EDGE TRIM .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .