Install charge air pipe on left
- Replace the molded seal.
Parts: Molded seal
- Position the charge air duct (4).
- Tighten down screws (3).TIGHTENING TORQUE SPECIFICATIONS
Charge-air tube to turbocharger M6x16 Tightening torque 8 Nm - Connect and lock the plug connection (1).
- Clip in the cable clip (2) at the charge air duct (4).
Follow-up work
- Refer to INSTALLING TOPPING CLEAN AIR PIPE ON LEFT .
- Refer to INSTALLING THE LEFT THROTTLE BODY .
- Refer to INSTALLING THE CENTER COWL UPPER PART .
- Refer to INSTALLING THE FRONT HOOD SEAL AT THE REAR .
- Refer to INSTALLING TENSION STRUT ON SHOCK TOWER .
- Refer to INSTALLING WINDSHIELD PANEL COVER .
- Refer to INSTALLING THE COVER OF THE ENGINE COMPARTMENT ON THE REAR LEFT .
- Refer to INSTALLING THE REAR RIGHT ENGINE COMPARTMENT COVER .
- Refer to INSTALLING LEFT INTAKE SILENCER HOUSING .
- Refer to INSTALLING ACOUSTIC COVER .