Preparing New Part
- Make severance cut (1) on new part of the side frame in accordance with severance cut on vehicle.
- Remove the adhesive residues in areas (1) to (3) on the vehicle.
- Prepare areas (1) and (2) for joining by welding.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Spot-weld bonding steel components - In area (1), be aware of double the number of welding spots, due to the spot-welded adhesive joints of the series.
Prepare area (1) for spot welding and plug-welds. Prepare plug welding at inner sill.
- In the area (2), observe spot-welded adhesive joints between inner sill and floor panel. Prepare the area (2) in such a way that the repair welding spots can be set on the series welding spots on the vehicle.NOTE: TECHNICAL INFORMATION
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: 41 00... BMW bonding instructions - Prepare area (3) for structure bonding steel on steel.
- Remove the adhesive residues in areas (1) on the vehicle.
- Prepare areas (1) and (2) for joining by welding.
- Prepare areas (1) for joining by spot welding and by punching sheet metal. Be aware of double the number of welding spots, due to the spot-welded adhesive joints of the series. Prepare plug welding at A-pillar-inner part.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Welding in reinforcement plates (sheet steel) - Prepare a reinforcement plate (2) for the removed aperture (1).
- Perform the operation for all removed apertures (1).NOTE: TECHNICAL INFORMATION
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: 41 00... BMW bonding instructions - Prepare areas (2) for structure bonding steel on steel.
- Prepare areas (3) for joining by welding.
- Adjust reinforcement plate (1).
- Adjust new part to fit with alignment bracket or universal mount and secure.
- Prepare areas (1) and (2) for joining by welding.
- In area (1), be aware of double the number of welding spots, due to the spot-welded adhesive joints of the series.
- Prepare areas (1) and (2) for joining by welding.
- Prepare the joining areas (2) in such a way that the repair welding spots can be set on the series welding spots on the vehicle.
- The sequence welded joint (3) is not used and is replaced by the welded connection (4).
- Mark severance cuts (1) and (2) on new part in accordance with severance cuts on vehicle and cut.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Welding in reinforcement plates (sheet steel) - For severance cuts (1) and (2), prepare reinforcement plates.
- Adjust reinforcement plates and new part to fit.
- Prepare areas (1) and (2) for joining by welding.
- In area (2), be aware of double the number of welding spots, due to the spot-welded adhesive joints of the series.NOTE: TECHNICAL INFORMATION
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: 41 00... BMW bonding instructions - Prepare area (3) for structure bonding steel on steel.
Renew T-bolt
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Take the quantity and position from the component to be renewed.
- Renew T-bolts (1).
Parts: T-bolt
- Weld the T-bolt (1) onto the new part.