Install the front power distribution box
- Connect the connector (1) to the power distribution box (2) and lock it.
- Position the power distribution box (3) and feed it in downwards.
- Tighten down screws (2).
tightening torque specification
| Front power distribution box | ||
|---|---|---|
| M8x35 screw | Tightening torque | 13 nm |
- Tighten down screw (1).
tightening torque specification
| Front power distribution box | ||
|---|---|---|
| Screw ts5x16 | Tightening Torque | 2.5 nm |
- Feed in the accompanying cable and tighten the nut (2).
tightening torque specification
| Positive battery cable | ||
|---|---|---|
| Flange Nut M8 | Tightening torque | 15 nm |
- Feed in the accompanying cable and tighten the screw (1).
tightening torque specification
| Auxiliary terminal for jump starting | ||
|---|---|---|
| Positive pole screw | Tightening torque | 15 nm |
- Correctly position cover (3) and tighten screws (1).
tightening torque specification
| Front power distribution box sealing frame | ||
|---|---|---|
| Bolt rf5x25 | Tightening torque | 2.5 nm |
- Secure the cable clips (2).
- Feed in the cover (2) in a downwards direction.
- The detents (1) must be locked correctly.
Follow-up work
- Refer to INSTALLING THE CENTER COWL UPPER PART .
- Refer to INSTALLING THE REAR HOOD SEAL .
- Refer to INSTALLING WINDSHIELD PANEL COVER .
- Refer to INSTALLING LEFT AND RIGHT WIPER ARM .
- Refer to INSTALLING THE COVER OF THE ENGINE COMPARTMENT ON THE REAR LEFT .
- Refer to CONNECTING ALL BATTERY GROUND LEADS .
- Refer to ACTIVATING THE 48V ELECTRICAL SYSTEM .