Installing the band elimination circuit
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Feed in wave trap (3) and position correctly.
- Tighten down screw (1).
TIGHTENING TORQUE SPECIFICATION
| Band elimination circuit to body | ||
|---|---|---|
| Screw | tightening torque | 3 Nm |
- Connect connectors (2) and lock.
Follow-up work
- Refer to INSTALLING THE HEADLINING (LOWERED) .
- Refer to INSTALLING THE HEADLINING (WITH SLIDING/TILTING SUNROOF) (LOWERED) .
- Refer to INSTALLING D-PILLAR TRIM PANEL ON LEFT AND RIGHT .
- Refer to INSTALLING COVER OF THE LUGGAGE COMPARTMENT SIDE SHELF LEFT AND RIGHT .
- Refer to INSTALLING THE LEFT AND RIGHT C-PILLAR TRIM PANEL .
- Refer to INSTALLING THE GRAB HANDLE AT THE REAR LEFT AND RIGHT .
- Refer to INSTALLING THE LEFT AND RIGHT B-PILLAR TRIM PANEL PARTIALLY .
- Refer to INSTALLING INTERIOR ROOF LIGHT .
- Refer to INSTALLING ROOF FUNCTION CENTER (FZD) .
- Refer to INSTALLING THE SUN VISORS AND COUNTER SUPPORT ON THE LEFT AND RIGHT .
- Refer to INSTALLING A-PILLAR TRIM PANEL, LEFT AND RIGHT .