Install exhaust camshaft of the bank 1
- Plastic rings (1) are maintenance free and do not need to be replaced.
- Check plastic rings for damage, replace if necessary.
- Position exhaust camshaft.
- Position exhaust camshaft guide bearing shell.
- Screw in guide bearing screws in the order (1) to (10) by a half turn at a time until they can no longer be tightened.
- Tighten screws in the order (1) to (10) .
TIGHTENING TORQUE SPECIFICATIONS
| Intake/exhaust camshaft | ||
|---|---|---|
| M6 | Tightening torque | 10 Nm |
- Install roller tappet (1) into the high pressure pump bracket (2) .
Follow-up work
- Refer to INSTALLING BOTH VANOS ADJUSTERS (CYLINDER HEAD DISASSEMBLY, BANK 1) .
- Refer to FASTENING THE COOLANT LINE BETWEEN THE COOLANT PUMP AND THE HEAT EXCHANGER .
- Refer to INSTALLING THE BELT PULLEY ON THE TORSIONAL VIBRATION DAMPER .
- Refer to INSTALLING THE ELECTRIC COOLANT PUMP WITH THE HOLDER (CYLINDER HEAD COVER MOUNTED) .
- Refer to INSTALLING THE CYLINDER HEAD COVER ON THE RIGHT .
- Refer to INSTALLING WIRING HARNESS SECTION FOR IGNITION SYSTEM OF BANK 1 .
- Refer to SECURING THE WIRING HARNESS SECTION FOR THE INTEGRATED POWER SUPPLY MODULE .
- Refer to INSTALLING RIGHT HIGH PRESSURE PUMP .
- Refer to INSTALLING THE HEAT SHIELD OF THE CRANKCASE VENTILATION OF CYLINDERS 1 TO 4 .
- Refer to INSTALLING FUEL DELIVERY LINE .
- Refer to SECURING THE FUEL SUPPLY LINE ON THE LEFT .
- Refer to SECURING COOLANT LINES FOR THE EXHAUST TURBOCHARGERS .
- Refer to INSTALL RAIL OF CYLINDER BANK 1 .
- Refer to INSTALLING RAIL ON BANK 2 .
- Refer to INSTALLING THE IGNITION COILS OF CYLINDERS 5 AND 6 .
- Refer to INSTALLING IGNITION COILS OF CYLINDER BANK 1 .
- Refer to INSTALLING THE LEFT THROTTLE BODY .
- Refer to INSTALLING THE CHARGE AIR COOLER ON THE RIGHT and INSTALLING THE LEFT-HAND CHARGE AIR COOLER .
- Refer to CLOSING THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to CLOSING THE LOW-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING FRONT UNDERBODY PROTECTION .
- Refer to INSTALLING THE LOWER LEFT FRONT WHEEL ARCH COVER .
- Refer to INSTALL DRIVE BELT .
- Refer to INSTALLING COVER FOR THE LEFT DME CONTROL UNIT .
- Refer to INSTALLING FAN COWL .
- Refer to INSTALLING THE RIGHT UNFILTERED-AIR DUCT .
- Refer to INSTALLING OIL FILLER NECK .
- Refer to INSTALLING UPPER CATALYTIC CONVERTER NEAR ENGINE FOR BANK 2 .
- Refer to INSTALLING CATALYTIC CONVERTER NEAR THE ENGINE ABOVE CYLINDER BANK 1 .
- Refer to INSTALLING HEAT SHIELD, TOP .
- Refer to INSTALLING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 1 TO 4 .
- Refer to INSTALLING THE LAMBDA OXYGEN SENSOR FOR THE CYLINDERS 5 TO 8 .
- Refer to INSTALLING THE CROSSING OF THE TRANSMISSION WIRING HARNESS .
- Refer to INSTALLING THE COOLANT EXPANSION TANK FOR THE LOW-TEMPERATURE .
- Refer to INSTALLING BRACKET FOR RIGHT INTAKE SILENCER .
- Refer to INSTALLING THE OXYGEN SENSOR MONITOR FOR CYLINDERS 1 TO 4 .
- Refer to INSTALLING RIGHT INTAKE SILENCER HOUSING .
- Refer to INSTALLING THE LEFT UNFILTERED-AIR DUCT .
- Refer to INSTALLING THE LEFT INTAKE SILENCER BRACKET .
- Refer to INSTALLING THE OXYGEN SENSOR MONITOR FOR CYLINDERS 5 TO 8 .
- Refer to FASTENING THE ACTIVATED-CHARCOAL FILTER LINE .
- Refer to INSTALLING THE ENGINE VENTILATION LINE OF CYLINDER BANK 2 .
- Refer to FASTENING THE ENGINE VENTILATION LINE OF CYLINDER BANK 2 .
- Refer to INSTALLING LEFT INTAKE SILENCER HOUSING .
- Refer to INSTALLING THE REAR TOP CROSS CONNECTION .
- Refer to INSTALLING THE FRONT-END STRUT .
- Refer to INSTALLING UPPER CROSS CONNECTION .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT AT TOP LEFT and INSTALL THE COVER IN THE ENGINE COMPARTMENT ON THE TOP RIGHT .
- Refer to RECONNECTING ALL BATTERY GROUND LEADS .
- Refer to FILLING THE HIGH-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLING EQUIPMENT .
- Refer to VENTING THE HIGH-TEMPERATURE COOLANT SYSTEM .
- Refer to FILLING THE LOW-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLING EQUIPMENT .
- Refer to VENTING THE LOW-TEMPERATURE COOLING SYSTEM .