Installing engine ventilation line of cylinder bank 1
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Insert the engine ventilation line (2) and turn it counterclockwise.
- Tighten down screws (1) .
TIGHTENING TORQUES SPECIFICATION
| Engine ventilation line | ||
|---|---|---|
| Screw | Tightening torque | 10 Nm |
- Position engine ventilation line (2) .
- Connect and lock retaining clip (1) .
Follow-up work
- Refer to INSTALLING THE TANK VENTILATION LINE OF CYLINDER BANK 1 PARTIALLY .
- Refer to INSTALLING CONDUIT ON BANK 1 .
- Refer to INSTALLING EXPANSION TANK FOR THE CHARGE AIR COOLER .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE COVER PANEL OF THE MASTER DME CONTROL UNIT .