Supplying The New Parts Required
NOTE:
DANGER
High-voltage system.
The high-voltage system operates on the basis of hazardous, electrical voltage and high currents. Mortal hazard through electric shock!
High-voltage system.
The high-voltage system operates on the basis of hazardous, electrical voltage and high currents. Mortal hazard through electric shock!
- All work on the high-voltage system may only be carried out by specially trained and technically experienced personnel.
- For additional information see:
- For additional information see:
NOTE:
TECHNICAL INFORMATION
- Observe the procedure for repair stage 2.
For additional information see: 41 00... REPAIR TECHNIQUES, REPAIR STAGE 2 (X3) .
- For information about stripping and rebuilding operations, refer to the surrounding text in the AIR. See the FRU number.
Preliminary work
- Refer to REMOVE FLAP IN LUGGAGE COMPARTMENT TRIM PANEL ON RIGHT .
- Refer to DE-ENERGIZE THE HIGH-VOLTAGE SYSTEM .
- Refer to CHECK THAT NO VOLTAGE IS APPLIED .
- Prepare the following new parts (see Electronic Parts Catalog [EPC]):
Rear wall (1)
Reinforcement plate, door sill
Reinforcement plate, C-pillar
Reinforcement plate, D-pillar
Plastic nut
NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... OVERVIEW OF CONSUMABLES (ELECTRONIC PARTS CATALOG) (X3) . - Supply the following consumables:
| Material | Quantity |
|---|---|
| Adhesive K5 (195 ml) | 1 |
| Adhesive K5 (50 ml) | 1 |
| Blind rivet N3 | 10 |
| Punch rivet N4 | 60 |
| Punch rivet N5 | 10 |
| EMC screw | 4 |
| Cleaning agent R1 | 1 |
| Cleaning agent R2 | 1 |
| Cavity protection wax remover | |
| Sealant D1 |