Installing coolant pipe
- Thread in and install both coolant pipes (1).
- Connect coolant hose on coolant expansion tank for the low-temperature coolant circuit.
- Fasten screws (1) on the coolant line.TIGHTENING TORQUE SPECIFICATIONS
Coolant pipe on coolant chamber end cover M6x25 Tightening torque 10 Nm - Connect the coolant hoses.
- Secure hose clips (2) and (3) with special tool 0 495 794 (17 2 050).
- Attach plug connection (1) to cylinder head 1-6 and lock audibly.
- Feed in and install positive battery cable.
- Secure positive battery cable in the clamps (1).
- Secure positive battery cable in the clamps (1).
- Insert and install vacuum line (1).
- Secure vacuum line (1) in the clamps.
- Connect vacuum line (2).
The detents (1) must audibly lock.
Follow-up work
- Refer to INSTALLING THE INTERMEDIATE FLANGE OF THE INTAKE PLENUM .
- Refer to INSTALLING THE INTAKE PLENUM .
- Refer to INSTALLING THE TANK VENT LINE .
- Refer to INSTALLING THE ENGINE VENTILATION LINE ON THE INTAKE SYSTEM .
- Refer to MOUNTING THE RIGHT-HAND CHARGE AIR COOLER .
- Refer to INSTALLING THE RIGHT THROTTLE BODY .
- Refer to MOUNTING THE LEFT-HAND CHARGE AIR COOLER .
- Refer to INSTALLING THE COMPLETE FRONT AXLE WITH THE ENGINE AND TRANSMISSION .