Install the high-pressure line between the high-pressure rail and the high-pressure pump
- Thread in and install the high pressure line (3).
- Tighten union nut (1) hand tight.
- Tighten union nut (1).
TIGHTENING TORQUES SPECIFICATION
| High pressure line between the rail and the high pressure pump | ||
|---|---|---|
| M14x1.5 | Tightening torque | 33 Nm |
- Tighten down screw (2).
TIGHTENING TORQUES SPECIFICATION
| Fuel line to cylinder head cover | ||
|---|---|---|
| 6x18 | Tightening torque | 7 Nm |
- Check fuel system for leak tightness.
Follow-up work
- Install the IGNITION COILS .
- Install the top engine sound insulation SERVICE OPENING .
- Install ACOUSTIC COVER .
- Reconnect all battery GROUND LEADS .