Installing coolant pumps
- Feed in and install the coolant pump (2).
- Tighten down screws (1).
TIGHTENING TORQUES SPECIFICATION
| Coolant pump to component carrier | ||
| M6x20 | Tightening torque | 8 ± 1 Nm |
- Feed in and install the belt pulley (1).
- If the screws (arrows) are reused, clean the thread and coat with Loctite 243.
ADHESIVE DESCRIPTION
| Screw lock Loctite Stick 243, medium strength | 10 ml, Bottle | 83192210339 |
- Hand-tighten the bolts (arrows).
Follow-up work
- Refer to INSTALLING THE FLANGE SUPPORTS ON THE COMPONENT CARRIER .
- Refer to INSTALLING COOLANT LINE BETWEEN THE COOLANT PUMP AND CYLINDER HEAD .
- Refer to CONNECTING THE COOLANT LINES FOR THE HIGH-TEMPERATURE COOLANT CIRCUIT .
- Refer to INSTALLING THE DRIVE BELT FOR THE COOLANT PUMP .
- Refer to TIGHTENING BELT PULLEY .
- Refer to INSTALLING THE ACOUSTIC COVER FOR THE ENGINE AT THE FRONT .
- Refer to FILLING THE HIGH-TEMPERATURE COOLING SYSTEM WITH THE VACUUM FILLING EQUIPMENT .
- Refer to CONNECTING NEGATIVE BATTERY CABLE OF THE SYSTEM BATTERY .
- Refer to INSTALLING BATTERY COVER IN TRUNK .
- Refer to CONNECTING THE NEGATIVE BATTERY CABLE (12 V BATTERY) .
- Refer to ACTIVATING HIGH-VOLTAGE SYSTEM .
- Refer to INSTALLING FLAP IN RIGHT LUGGAGE COMPARTMENT TRIM PANEL .
- Refer to VENTING THE HIGH-TEMPERATURE COOLANT SYSTEM .
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING THE CENTER UNDERBODY PROTECTION .
- Refer to INSTALLING THE FRONT UNDERBODY PROTECTION .