LEMON Manuals: Even more car manuals for everyone
Home >> BMW >> 2018 >> 340i xDrive Automatic Trans >> Repair and Diagnosis >> External Pages >> Different car >> Section 271 (Engine - Repair (F30, 4-CYL RWD)) >> 11 51 Water Pump >> 11 51 030 Remove and install component carrier (integral support frame) (B48B)

11 51 030 Remove and install component carrier (integral support frame) (B48B)

WARNING: This page is about a different car, the 2018 BMW 330i and 2017 BMW 330i. However, it is still accessible from the selected car via links, so may be relevant.
NOTE: Air conditioning does not have to be drawn off.

Necessary preliminary tasks: 

Removal: 

Disconnect vacuum hose (1) from clamp (2).

G12701335Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1 - 3).

G12701336Courtesy of BMW OF NORTH AMERICA, INC.

Release screws (1 - 4).

Loosen component carrier from the fitting sleeve and remove.

G12701337Courtesy of BMW OF NORTH AMERICA, INC.

Installation: 

Clean sealing surface (1).

Check fitting sleeves for damage in the marked area.

Replace faulty fitting sleeves.

NOTE: Sealing surfaces (1) must be clean and free of grease.
G12701338Courtesy of BMW OF NORTH AMERICA, INC.
NOTE: Sealing bead (1) is bonded on coolant pump.
If a sealing bead (1) protrusion is present and not damaged, coolant pump can be installed again with the existing sealing bead (1).
If sealing bead (1) is damaged, it must be removed.
Apply SEALING COMPOUND 2.2  (Loctite 5970).
Sealing compound height approx. 2 mm - 2.5 mm.
G12701339Courtesy of BMW OF NORTH AMERICA, INC.

Position component carrier.

Tighten screws in sequence (1 - 3).

Tightening torque 11 51 3AZ .

Fig 1: Component Carrier Screws Tightening Sequence (1 To 3)
G12701336Courtesy of BMW OF NORTH AMERICA, INC.

Tighten screws in the sequence (1 - 4).

Tightening torque 11 51 3AZ .

Fig 2: Component Carrier Screws Tightening Sequence (1 To 4)
G12701337Courtesy of BMW OF NORTH AMERICA, INC.

Attach vacuum line (1) into clamp (2).

G12701335Courtesy of BMW OF NORTH AMERICA, INC.

Required follow-up work: