REP-TAT-P-5175-02 Installing the sound insulation on the bulkhead upper part center
- Check the seal on the bottom of the sound insulation (2) for damage, replace if necessary.
- Position the sound insulation (2).
- Tighten the screws (1).
TIGHTENING TORQUES SPECIFICATION
| Sound insulation to bulkhead upper part | |
| Screw | 8.0 N.m |
- Clip in the sealing (2) in the direction of arrow.
- Fasten expanding rivet (1).
- Secure positive battery cable at the sealing (2).
Follow-up work
- Install the TRAILING LINK ON SPRING STRUT DOME
- Install the COVER IN ENGINE COMPARTMENT ON LEFT OR RIGHT
- Install the COVER IN ENGINE COMPARTMENT ON LEFT OR RIGHT