Install corrosion protection cover
- Position and install the (1) corrosion protection cover at the guides in the areas marked.
Follow-up work
- Refer to INSTALLING ACOUSTIC COVER .
- Refer to INSTALLING SOUND INSULATION AT THE CENTER OF THE BULKHEAD UPPER PART .
- Refer to INSTALLING TENSION STRUT ON SPRING STRUT TOWER .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE LEFT .
- Refer to INSTALLING THE COVER IN THE ENGINE COMPARTMENT ON THE RIGHT .