11 65 020 Removing and installing or replacing turbocharger (N57): Notes
Special tools required:
- 11 6 050 .
Only perform this repair work on an engine that has cooled down.
For turbocharger damage:
In order to avoid subsequent damage, the following notes and test steps must always be followed: see TURBOCHARGER DAMAGE DUE TO BLOCKED OIL SUPPLY LINES and TEST STEPS IN THE EVENTING OF TURBOCHARGER DAMAGE .
Necessary preliminary tasks:
- Remove ACOUSTIC COVER .
- Remove front SOUND INSULATION COVERS .
- Draw off A/C SYSTEM .
- Remove REINFORCEMENT PLATE .
- Remove right PRESSURE PIPE .
Release screws (1).
Pull the refrigerant line (2) off.
Installation note:
Replace the sealing ring.
Tightening torque 64 53 5AZ .
Release screws (1).
Pull the refrigerant line (2) off.
Installation note:
Replace the sealing ring.
Tightening torque 64 53 3AZ .
Loosen the bolt (2) on the hydraulic unit.
Unclip rubber grommets (1 and 3).
Undo bolts (1) on sound muffler.
Pull sound muffler (1) forwards off turbocharger.
Disconnect plug connection (1) on actuator drive.
Release screw (2).
Unlock clip (3) in direction of arrow.
Pull off air intake hose (4) in direction of arrow.
Release banjo bolt (1).
Disconnect line (2).
Tightening torque 11 42 2AZ .
Installation note:
Clean sealing surfaces.
Unfasten hose clamp (1).
Return line is also removed when turbocharger is removed.
If necessary, remount oil return line and replace gasket.
Release screw (1) of clamp between diesel particle filter and turbocharger.
Installation note:
Clamp must be replaced after removal.
Tightening torque 18 31 2AZ .
Release screws (1).
Remove holder (2).
Tightening torque 11 65 2AZ .
Release screw (1).
Turn oil filler neck (2) in the direction of the arrow to stop.
Remove oil filler neck (2) towards top.
Press locking hooks (1) down.
Remove hose (2) for engine ventilation.
Undo screw on V-strap clamp between turbocharger and exhaust manifold.
Tightening torque: 11 65 1AZ .
Pull hydraulic unit to the side and Maneuver out/remove turbocharger (1) upwards in position illustrated.
Installation note:
Screw connection of V-band clamp is too loose.
If you can see a gap between the ends of the V-band clamp, release and then repeat the screw connection.
Tightening torque: 11 65 1AZ .
Installation note:
Screw connection of V-band clamp is too tight.
If the ends of the V-clip are positioned under each other, release and then repeat the screw connection.
Tightening torque: 11 65 1AZ .
Installation note:
Pay attention to retaining pin (1) when installing turbocharger.
Replace sealing ring (2).
If necessary, replace turbocharger.
Release banjo bolt (1).
Installation note:
Tightening torque 11 42 2AZ .
Replace sealing rings.
Engine oil line must run obliquely along the housing (see illustration).
Assemble engine.
Observe diagnosis instructions.
- Complete vehicle
- Power train
- Engine electrical system
- Air supply
- Charging pressure control