Preparing New Part
NOTE:
TECHNICAL INFORMATION
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: 41 00... BMW bonding instructions
Structural adhesive bonding.
Observe preparation of bonding surfaces.
For additional information see: 41 00... BMW bonding instructions
- Adjust new parts to fit with alignment bracket or universal fixture and secure.
- Prepare areas (1) for structural adhesive bonding of steel to aluminum.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Transferring hole pattern. - In areas (1), transfer the hole pattern from the engine mount to the carrier support. Drill out holes to dia. 6.8 mm.
- Prepare areas (1) and (2) for structural adhesive bonding of aluminum to aluminum.
- In areas (1), transfer the hole pattern from the engine mount to the strut tower. Drill out holes to dia. 6.8 mm.
- In areas (2), transfer the holes from the engine mount to the strut tower. Drill out holes to dia. 6.8 mm.
- Prepare areas (1) and (2) for structural adhesive bonding of steel to aluminum.
- In areas (1) and (2), transfer the holes from the wheel well to the strut tower. Drill out holes to dia. 6.8 mm.
- Prepare areas (1) for structural adhesive bonding of steel to aluminum.
- In areas (1), transfer holes from the engine compartment bulkhead to the strut tower. Drill out holes to dia. 6.8 mm.
- Prepare areas (1) for structural adhesive bonding of steel to aluminum.
- In areas (1), set holes of Ø 6.8 mm on new parts. Make holes analogous to the series production in terms of number and position.
- Adjust the new part (1) and in areas (2) and (3) for joining by welding.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Spot-weld bonding steel components - In areas (3), observe the procedure when replacing spot-welded adhesive joints for series production.
- Prepare areas (1) and separating cuts (2) for joining by welding.NOTE: TECHNICAL INFORMATION
For additional information see: 41 00... Spot-weld bonding steel components - In the area (1), observe the procedure when replacing spot-welded adhesive joints for the series production.
- Prepare areas (3) and (4) for structural adhesive bonding of steel to aluminum.
- In areas (3), set holes of Ø 6.8 mm analogous to the series production.
- In area (4), set a bore of Ø 6.8 mm for blind rivet.
- Prepare areas (1) and (2) for joining by welding.
- In areas (2), observe the procedure when replacing spot-welded adhesive joints for series production.
While doing so, maintain sufficient distance to the bonded rivet connections in the areas (3).
Check ground pins and replace if necessary
NOTE:
Schematic diagram is for example purposes. Some parts may differ in certain details.
- Check the ground pins (1) for stability and renew if necessary.