17 11 000 Removing and installing radiator (S55)
WARNING:
Risk of scalding!
Only perform this repair work after engine has cooled down.
Only perform this repair work after engine has cooled down.
IMPORTANT:
Wear safety goggles and protective gloves.
Necessary preliminary tasks:
- Follow REPAIR WORK ON THE COOLING SYSTEM .
- Remove FAN COWL .
- Remove FRONT PANEL, CENTER
- Drain COOLANT .
Removal:
Unlock coolant hoses (1) from right radiator (2) and pull off.
Unlock coolant hoses (1) from left radiator (2) and pull off.
Release screws (1).
Remove cover (2) from the radiator.
Carefully feed out radiator upwards and remove.
Installation:
Carefully feed in radiator downwards and install.
Remove cover (2) from radiator.
Tighten down screws (1).
Tightening torque: 17 10 2AZ .
Connect coolant hoses (1) to left radiator (2) and lock.
Coolant hoses (1) must audibly engage.
Connect coolant hoses (1) to right radiator (2) and lock.
Coolant hoses (1) must audibly engage.
Required follow-up work:
- Install FAN COWL
- Install FRONT PANEL, CENTER
- BLEED COOLING SYSTEM (HIGH-TEMPERATURE COOLING CIRCUIT) with vacuum and fill